Milestone Srl MA245-003 – ultraWAVE 3 – User Manual
63
Wait one minute before opening the clamps manually, even if pressure has been already
completely released.
Opening of reactor after digestion run
At the end of the run all vials must be taken out and the system should be immediately and
carefully cleaned up and dried to avoid corrosion.
Follow the instructions on the display terminal to
properly open the reactor.
Once the system is pressure-free the clamps can be
opened. Turn the locking plug counter clockwise and
open the clamps.
Only if the system is completely without pressure, the
Pin locking device will allow to open the clamps.
Move the clamps to open the reactor