Milestone ultraWAVE 3 - FIRST USE AFTER INSTALLATION; Initial System Check and Startup Procedures

Milestone ultraWAVE 3
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Milestone Srl MA245-003 ultraWAVE 3 User Manual
48
Open the Nitrogen / Argon gas line and set the
pressure regulator at 5 - 6 bar
Plug-in the control cable of high-pressure
compressor to the ultraWAVE 3
Connect the compressor plug to the power supply
line
Switch on the compressor
The installation of the High-pressure compressor
is completed