EasyManua.ls Logo

Muratec F-525 - Pad Pressure (1 St Cst); (2 Nd Cst); Roller Pick up (1 St Cst); (2 Nd Cst)

Muratec F-525
383 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-55
ROLLER PICK UP (1st CST) / (2nd CST)
1) Pull out the Cassette 1st.
2) Remove one plastic ring and bearing.
3) Release the roller tab from the shaft groove, and remove the ROLLER PICK UP.
Cassette 1st
Roller pick up
E-ring
PAD PRESSURE (1st CST) / (2nd CST)
1) Remove the Roller pick up.
2) Remove the PAD PRESSURE.
Pad pressure

Table of Contents

Other manuals for Muratec F-525

Related product manuals