Return the Server to the Normal Rack Position
Caution - The server weighs approximately 64.0 pounds (29.03 kg). Two people are required to
carry the chassis and install it in the rack.
1.
Lift the server from the antistatic mat, and reinstall the server into the rack.
Refer to “Installing the Server Into a Rack” in Oracle Servers X8-2 and X8-2L Installation
Guide for the installation instructions specific to your rackmount kit.
2.
If the cable management arm (CMA) is not installed, that is, you removed it
because you removed the server completely out of the rack, install the CMA.
For installation instructions for the CMA, refer to “Install the Cable Management Arm
(Optional)” in Oracle Servers X8-2 and X8-2L Installation Guide.
3.
If the cables are disconnected from the back of the server, that is, you
disconnected the cables because you removed the server completely out of the
rack, reconnect the cables.
■ For instructions to reconnect cables to the back of the server, see
“Reconnect Power and Data Cables” on page 222.
■ To identify the location of cable connectors on the back of the server, refer
to “Back Panel Connector Locations” on page 41.
Related Information
■
“Remove the Server From the Rack” on page 64
■
“Reconnect Power and Data Cables” on page 222
Return the Server to the Normal Rack Position
If the server is in the extended maintenance position, use this procedure to return the server to
the normal rack position.
1.
Push the server back into the rack, as described in the following steps.
a.
Simultaneously pull and hold the two green release tabs (one on each side
of the slide rails on the server) toward the front of the server while you push
the server into the rack.
As you push the server into the rack, verify that the cable management arm (CMA) retracts
without binding.