SINAMICS DCP
Operating Instructions, 09/2019, A5E34382853K
119
Not observing fundamental safety instructions and residual risks
Not observing fundamental safety instructions and residual risks listed in Chapter 1 can
result in accidents with severe injuries or death.
• Comply with the fundamental safety instructions.
• Take into account residual risks when assessing risk.
6.1 Switching on
After the device is switched on (POWER ON, i.e. switching on the 24 V power supply), the
SINAMICS DCP powers up. Running up to operating state o7.1 in the SINAMICS DCP with
the saved parameters ("Copy from RAM to ROM" is performed) takes approx. 45 seconds.
Running up without the saved parameters (first commissioning) takes approx. 60 seconds.
Table 6- 1 SINAMICS DCP ramp-up times
Backlighting at the BOP20 RDY: Red
POWER ON
- RDY: orange
15 s
Display "run up" RDY: orange
35 s
Operating state 12.4 RDY: Green
40 s
Operating state 7.1 RDY: Green
45 s
1)
The status of the LEDs on the CUD (see also Chapter "Description of the LEDs on the CUD
(Page 362)") can only be seen when the device cover is open.
2)
Running up with saved parameters ("Copy from RAM to ROM" was performed).
Note
If options are being used and in the case of certain device configurations, the duration of
start
-up increases.