EasyManua.ls Logo

Siemens sinamics dcp - 6.2.2 Commissioning steps

Siemens sinamics dcp
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
6.2 Commissioning using the BOP20 operator panel
SINAMICS DCP
122 Operating Instructions, 09/2019, A5E34382853K
6.2.2 Commissioning steps
〈1〉Access level and parameter filter
(1) p0003 = 3 (expert)
(2) p0010 = 0 (no filter)
〈2〉Setting the installation altitude
p55100, installation altitude
Setting the installation altitude of the device above sea level.
With installation altitudes above 2000 m, the current and voltage are derated.
See Chapter "Derating (Page 357)".
〈3〉Setting the source for the control word
p0840 signal source for starting/stopping
Recommended setting: p0840 = r2090.0 (bit 0 in the 1st receive word from the fieldbus)
See function diagrams 2460, 2580 and 2650 in the SINAMICS DCP List Manual.
p0852 signal source for enabling operation
Recommended setting: p0852 = 1
See function diagrams 2580 and 2650 in the SINAMICS DCP List Manual.
〈4〉Setting the type of precharging
See also Chapter "Precharging of the DC links (Page 351)".
p55350, type of precharging
1
Resistance precharging on side 1, pulsing up on side 2
2
Resistance precharging on side 2, pulsing up on side 1
3
Resistance precharging on both sides (first side 1, then side 2)
4
Resistance precharging on both sides (first side 2, then side 1)
p55352 signal source for precharging the target value
This signal source must be interconnected at p55350 = 1 or 2.
Recommended setting: p55352 = r2050[2] (3rd receive word from the fieldbus)
See function diagram 6835 in the SINAMICS DCP List Manual.

Table of Contents

Other manuals for Siemens sinamics dcp

Related product manuals