Electrical connection
5.4 Terminals and connectors
SINAMICS DCP
Operating Instructions, 09/2019, A5E34382853K
47
Power connections
The power connections are defined as follows:
P1
Side 1: Plus cable
N1
Side 1: Minus cable
P2
Side 2: Plus cable
N2
Side 2: Minus cable
Power connections at the 30 kW device
The DC power connection, side 1 (P1, N1) is located at the lower left of the device.
The DC power connection, side 2 (P2, N2) is located at the lower right of the device.
The ground connection is located at the bottom left of the device.
Power connections at the 120 kW device
The DC power unit connections, side 1 (P1, N1) and side 2 (P2, N2) are located at the
top of the device (see connection overview).
For option M69 (power connections, top/bottom), the connections are located at the top of
the device (P1, N1) and at the bottom of the device (P2, N2).
For option M79 (power connections from the bottom), the connections are located at the
bottom of the device.
The ground connection is located at the top and bottom of the device