Tips
13.4 Integrating PG/PC into the network (NetPro)
CNC Part 1 (NCK, PLC, drive)
200 Commissioning Manual, 11/2006, 6FC5397-2AP10-2BA0
Figure 13-15 Configured PG/PC in the network configuration
8. Select "Save and compile > Save and check all" and confirm the process with "OK".
The subsequent operator input sequence steps describe loading this hardware
configuration to NCU.