Self Test configuration menu (Utility menu)
Use this menu to view power-on diagnostic results, run extended self tests, and verify the 250 k
Ω termination control works on input
channels.
To open the Self Test configuration menu:
1. Tap Utility in the Menu bar.
2. Tap Self Test....
Tap anywhere outside of the menu to close the menu.
Note: Remove all input signals before running the extended self tests.
Self Test configuration menu fields and controls
Field or control Description
250 kΩ Verification Opens a menu to verify that 250 kΩ termination can be enabled or disabled for every channel. Closing
the menu restores the normal termination setting of all connected probes.
Export Log Files Opens a menu that lets you save instrument log files to a .zip-compressed file. The log file is
a valuable information resource when working with T
ektronix Customer Support to troubleshoot a
problem or report an issue.
You can navigate to the TekDrive location to export log files.
Power-on Self test Results Displays the power-on self test status (Passed or Failed).
Extended Self Test Results Lists the status of each Extended self tests (Passed or Failed).
If one or more tests fail at power-on, tap on Run Self Test and see if the test or tests continue to fail. If
tests continue to fail, contact your nearest Tektronix Service Center for help with resolving the problem.
Run N Times Sets the number of times to run the extended self tests.
Run Self Test / Abort Self Test Tap Run Self Test to run the extended self tests. While tests are running, the button changes to Abort
Self Test. When self tests are stopped, the button reverts to Run Self Test.
Note: Remove all input signals before running the extended self tests.
Tap the Abort Self T
est button anytime to stop testing.
Calibration configuration menu (Utility menu)
Use this menu to perform a signal path compensation or view the factory calibration status.
T
o open the Calibration configuration menu:
1. Tap Utility in the Menu bar
2. Tap Calibration....
Menus and dialog boxes
196