Installation 3-11
EMC Considerations
Installation Requirements to Ensure Conformance
Motion Coordinator MC202
When the Trio products are tested they are wired in a typical system configura-
tion. The wiring practices used in this test system must be followed to ensure the
Trio products are compliant within the completed system.
A summary of the guidelines follows:
1) The MC202 modules should be earthed via its EARTH connection of the CAN con-
nector.
2) If any IO lines are not to be used they should be left unconnected rather than
being taken to a terminal block, for example, as lengths of unterminated cable
hanging from an IO port can act as an antenna for noise.
3) Screened cables should be used for encoder, stepper and registration input feed-
back signals and for the demand voltage from the controller to the servo ampli-
fier if relevant. The demand voltage wiring must be less than 1m long and
preferably as short as possible. The screen should be connected to earth at both
ends. Termination of the screen should be made in a 360 degree connection to a
metallised connector shell. If the connection is to a screw terminal e.g. demand
voltage or registration input the screen can be terminated with a short pig-tail to
earth.
4) Connection to the serial ports should be made with a Trio supplied cable. When a
Motion Coordinator is not connected to a PC the serial cable must be removed as
it will act as an antenna for electrical noise if it is left unterminated.
5) The MC202 should not be handled whilst the 24 volt power is connected.
As well as following these guidelines, any installation instructions for other prod-
ucts in the system must be observed.
Motion Coordinator Euro 205
The Euro205 should be mounted in a screened metal card cage. The power sup-
plies should be generated by regulated filtered supplies.
The following requirements should also be adhered to:
1) The Euro205's front panel should be earthed.
2) If any IO lines are not to be used they should be left unconnected rather than
being taken to a terminal block, for example, as lengths of unterminated cable
hanging from an IO port can act as an antenna for noise.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Trio Motion Coordinator MC216 and is the answer not in the manual?

Trio Motion Coordinator MC216 Specifications

General IconGeneral
BrandTrio
ModelMotion Coordinator MC216
CategoryController
LanguageEnglish

Related product manuals