12 Check-List for Mounting
12-6
Was the cable sheath stripped off properly? Was the cable connected properly
to the contact ledge?
Are the connectors fastened with screws?
Was the terminal block connected properly? Did you check the connection?
Did you mind the fact that other nodes may cancel out the protective
separation?
With redundancy:
Is the connection between the terminal blocks correct?
Did you choose external termination? Is external termination supply provided?
Is the internal termination disabled?
With RS422, only
Did you select either internal or external termination?
With internal termination:
Is the termination active, if the module is located at the end of the bus?
With external termination:
Were both cable ends terminated properly?
Is the internal termination disabled?
Isa1k pull-up, 100 and1k pull-down resistance circuitry used as the
external termination?
Is an external 5-V power supply provided for external termination?
Were all connector pins not assigned to RS422 left free?
Is the appropriate cable used (sufficient wire CSA, shielded)?
Was the connector shield applied to terminal P?
Was the cable sheath stripped off properly? Was the cable connected properly
to the contact ledge?
Were the connectors fastened with screws?
Was the terminal block connected properly? Did you check the connection?
Did you mind the fact that other nodes may cancel out the protective
separation?
With redundancy:
Is the connection between the terminal blocks correct?
Did you choose external termination? Is external termination supply provided?
Was the internal termination disabled?