NTP 160 — Install an I-211M-K or I-211M-L indoor ONT
NTP 160-14 November 2013 Alcatel-Lucent 7302 ISAM | 7330 ISAM FTTN | 7360 ISAM FX ONT R04.06.02
Edition 01 3FE 55873 AAAA TCZZA
ONT Product Information Guide
15 For an I-211M-L indoor ONT installed in an enclosure, coil the excess cable before
routing it to exit one of the lower cable exit ports; see Figures NTP 160-5,
NTP 160-7, and NTP 160-8.
16 Verify the ONT LEDs, voltage status, and optical signal levels (DLP 127).
17 Activate and test the services (DLP 128).
18 STOP. This procedure is complete.