Installation and Initial Commissioning
H172203_1_001 205 / 234
19 Installation and Initial
Commissioning
Installation, initial commissioning, retrofitting, repairs, adjustments or dismantling of the
device must only be carried out by Bruker authorized personnel.
All the requirements concerning environment described in the technical specifications must
be met. To reduce the risk of electric shock and malfunctioning, install these devices in a
temperature-controlled and humidity-controlled indoor area free of conductive contaminants.
19.1 Check/Download Firmware
Figure19.1: Principle of Firmware Upgrading