Section 2 — Installation
Part No. 750-363 2-3
2.1 BOILER ASSEMBLY AND PLACEMENT
2.1.1 Packaging
The Cleaver-Brooks Model CFLC boiler is shipped fully assembled, ready for installation.
2.1.2 Lifting and moving the boiler
The Model CFLC boiler is lifted by means of the holes provided in the upper tube sheets. See rigging diagram
below.
Figure 2-1 CFLC Rigging
!
Caution
In order to avoid damage to the unit, lifting or
moving the boiler should only be done by
experienced personnel suitably equipped for
moving heavy equipment.
Note: The boiler
should not be moved
by pushing, prying, or
pulling on any part of
the casing.