EasyManuals Logo

GE MDS ORBIT ECR User Manual

GE MDS ORBIT ECR
463 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #404 background imageLoading...
Page #404 background image
404 MDS Orbit MCR/ECR Technical Manual MDS 05-6632A01, Rev. F
ssh
- Open a secure shell on another host
telnet
- Open a telnet session
top
- Exit to top level and optionally run command
traceroute
- Trace the route to a remote host
up
- Exit one level of configuration
6.17 Configure Mode Commands
annotate <statement> <text>
- Associate an annotation with a given configuration statement. To remove an annotation, leave
the text empty.
commit (check | and-quit | confirmed [<timeout>] [persist <token>] to-startup) [comment
<text>] [label <text>] [persist-id <id>]
- Commit current configuration to running.
check - Validate current configuration.
and-quit - Commit to running and quit configure mode.
confirmed -Commits the current configuration to running with a timeout. If no commit confirm
command has been issued before the timeout expires, then the configuration will be reverted to
the configuration that was active before the commit confirmed command was issued. If no
timeout is given then the confirming commit will have a timeout period of 10 minutes. The
configuration session will be terminated after this command since no further editing is possible.
Only available in configure exclusive and configure shared mode.
The confirming commit will be rolled back if the CLI session is terminated before confirming the
commit, unless the persist argument is given. If the persist command is given then the CLI
session can be terminated and a later session may confirm the pending commit by supplying the
persist token as an argument to the commit command using the persist-id argument.
comment <text> - Associate a comment with the commit. The comment can later be seen when
examining rollback files.
label <text> - Associate a label with the commit. The label can later be seen when examining
rollback files.
persist-id <id> - If a prior confirming commit operation has been performed with the persist
argument, then to modify the ongoing confirming commit process the persist-id argument needs
to be supplied with the same persist token. This makes it possible to, for example, abort an
ongoing persist commit, or extend the timeout.
compare running [brief]
- If changes have been made, but have not yet been committed, then those changes can be
reviewed prior to committing them by using the “compare” command. Differences will be

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE MDS ORBIT ECR and is the answer not in the manual?

GE MDS ORBIT ECR Specifications

General IconGeneral
BrandGE
ModelMDS ORBIT ECR
CategoryNetwork Router
LanguageEnglish

Related product manuals