EasyManuals Logo
Home>Manitowoc>Construction Equipment>MLC650

Manitowoc MLC650 User Manual

Manitowoc MLC650
360 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #323 background imageLoading...
Page #323 background image
Manitowoc Published 08-12-19, Control # 224-13_v2 4-187
MLC650 OPERATOR MANUAL SET-UP AND INSTALLATION
4
Removing Rotating Bed Handrails and Rear
Platform
NOTE: The handrails (12 and 13) on the left and right sides
of the rotating bed (shown in Figure 4-143
) are the
same and are removed in the same manner.
See Figure 4-143
for the following procedure:
NOTE: Handrails weigh approximately 6–15 kg (15–35 lb).
1. Remove the lanyard pin (17) from handrails (2–16).
2. Remove the handrails and prepare for shipping.
See Figure 4-144
for the following rear platform removal
procedure:
3. Remove the pins (5) from the upper platform and lower
the ladder (4) to the shipping position. Reinstall the pins.
4. Remove the two pins and quick release pins (3) from the
platform mounting bracket (2).
5. Using an assist crane or a forklift, raise and remove the
platform (1) and prepare for shipping.
NOTE: The platform and ladder combined weight is
approximately 60 kg (133 lb).
FIGURE 4-144
Item Description
1Platform
2 Platform Mounting Bracket
3 Quick Release Pin (qty 2)
4 Ladder (raised position)
4a Ladder (shipping position)
5Pin (qty 2)

Table of Contents

Other manuals for Manitowoc MLC650

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc MLC650 and is the answer not in the manual?

Manitowoc MLC650 Specifications

General IconGeneral
BrandManitowoc
ModelMLC650
CategoryConstruction Equipment
LanguageEnglish

Related product manuals