Manitowoc Published 08-12-19, Control # 224-13_v2 4-133
MLC650 OPERATOR MANUAL SET-UP AND INSTALLATION
Install the Boom Load Lines
1. Route the load lines up the boom. See Figure 4-164 on
page 4-210.
2. Pull the load lines approximately 20 ft (6,1 m) past the
end of the boom.
3. Install the load block(s)(10) and hook-and-weight ball (7)
after the boom is raised to a convenient height. See
Boom Raising Procedure on “Boom Raising Procedure”,
on page 4-126.
If equipped, the rigging winch can be used to assist in
pulling the load lines. See "Rigging Winch Operation" on
page 4-208.
4. Read the following topics:
• "Wire Rope Installation" on page 4-201
.
• "Load Line Reeving" on page 4-211
.
• "Wire Rope Specifications" on page 4-212
.
• Reeving diagrams at the end of this section
Install the Boom Block-Up Limit
Components
Install the block-up limit components as shown in
Figure 4-101
. The chains (14, stored) and weights (15,
stored) are shipped on the top and the point.