Manitowoc Published 08-12-19, Control # 224-13_v2 4-105
MLC650 OPERATOR MANUAL SET-UP AND INSTALLATION
Raise Boom Top Wire Rope Guide
See Figure 4-81, for the following procedure.
1. Rig two slings using shackles through the wire rope
guide lifting holes (View A), and raise the wire rope
guide. The assembly weighs approximately 1079 kg
(2379 lb).
2. Unpin the struts (3a, View A) from the shipping position.
3. Raise the wire rope guide (1, View B) to the working
position.
4. Raise the struts (3b, View B) and pin them to the wire
rope guide.
5. Disconnect the lifting slings.