EasyManuals Logo

Promise Technology VTrak M610i User Manual

Promise Technology VTrak M610i
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #147 background imageLoading...
Page #147 background image
Chapter 5: Management with the CLU
133
Figure 4. The CLU main menu
Quick Setup – A sequence of four steps to setup System Date & Time,
Management Port, and RAID Configuration.
Subsystem Management – View controller information, lock/unlock the
controller, set date and time, and monitor the enclosure.
Physical Drive Management – View disk drive assignments and parameters,
change disk drive cache settings and command queuing, and locate a physical
drive.
Disk Array Management – View disk array information, create and delete disk
arrays, transport, rebuild, PDM, and transition functions, and locate a disk array,
create and delete logical drives.
Logical Drive Management – View logical drive information, name logical
drives, initialization and redundancy check, and locate a logical drive.
Network Management – Set the IP address for Management Port, gateway, and
DNS server; subnet mask.
iSCSI Management – Node settings, Port statistics, Session information, iSNS
options, CHAPs, and Ping function.
Background Activity – Settings for Media Patrol, Auto Rebuild, Rebuild,
Migration, PDM, Transition, Synchronization, Initialization, Redundancy Check
rate, and thresholds.
Event Viewer – View the event logs.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Promise Technology VTrak M610i and is the answer not in the manual?

Promise Technology VTrak M610i Specifications

General IconGeneral
BrandPromise Technology
ModelVTrak M610i
CategoryNetwork Storage Server
LanguageEnglish

Related product manuals