Commissioning
6.3 Commissioning using the STARTER commissioning tool
SINAMICS DCP
Operating Instructions, 09/2019, A5E34382853K
133
Note
For a download, the bus address assigned here is transferred to the device, but is not
transferred to parameter p0918 (bus address).
To keep p0918 consistent with the project, after a "Load
to target device" a "Load to PG"
must still be performed
– and must be repeated after every change to p0918 using BOP20.
⇒ Click Insert
The selected drive unit is displayed in the project wizard preview window.
Figure 6-10 Inserting the drive unit - ready
⇒ Click Next >
A summary of the project is displayed.