A load with 110 % of the rated current is possible for 60 seconds:
Figure 7-63 "Low overload" load cycle - example: Load with 110 %
If load counter r55091 is at 100 %, for example, for a current of 0 A, then a recovery time
of approximately 3 seconds is required until the counter again reaches a value of 0 %.
The shorter recovery time is an advantage when compared to load cycle "High overload".
For higher currents, however below the rated current, then this time is correspondingly
extended.