For a lower overload, significantly longer operation up to shutdown with fault F60530 is
possible. 540 s for an overload of 110 %, for example:
Figure 7-65 "High overload" load cycle - examples: Load with 110 %
If load counter r55091 is at 100 %, for example, for a current of 0 A, then a recovery time
of approximately 25 seconds is required until the counter again reaches a value of 0 %.
This is a significantly shorter time than for load cycle "Low overload".
For higher currents, however below the rated current, then this time is correspondingly
extended.