151
Configuration Menu
The configuration of grid power (see the section „Grid Power“ above).
Up to two daily runtimes can be set in the time configuration. If only one runtime is needed, the second
one can be deleted by clicking on the trash can symbol.
Grid Power and Runtime Control:
This production determination is identical to that of the grid power
After selecting the production determination, the following sections are to be configured:
•
Power from the grid
•
Daily runtime
The configuration of grid power (see the section „Grid Power“ above).
The following settings can be made and/or activated under Daily runtime configuration:
•
Daily runtime [Min.] (this values is determined by the time from 0:00 to 23:59.)
• Minimal
• Exact
• Maximal
•
Fill runtime from
Depending on the situation, the period of time from the defined daily runtime might not be fulfilled
with the surplus rule. In this case, it can be defined in this box at which time the remaining daily
runtime should be fulfilled. The process is also carried out when there is no surplus available.
•
Minimum continuous switch on time [Min.]
•
Minimum continuous switch off time [Min.]
•
Max. switch on operations
The remaining daily runtime is completely fulfilled with the last switching run.
Note!
The daily runtime will be set to the value of the new day starting at 0:00 (midnight).
That is why it is not possible to have a runtime extending past the particular day. The
devices controlled in this section will be turned off at 0:00 (midnight).
Other
The Automatic timer type under Other category operates independent of the current PV production and
measured consumption.
Up to ten daily runtimes can be created by clicking on the plus symbol.
Levels that are not needed can be deleted by clicking on the trash can symbol.