EasyManuals Logo

Suzuki SWIFT 2005 User Manual

Suzuki SWIFT 2005
1496 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #701 background imageLoading...
Page #701 background image
Automatic Transmission/Transaxle: 5A-57
4 Check timing solenoid valve resistance
1) Turn ignition switch OFF.
2) Disconnect valve body harness connector (1), (2) on
transaxle.
3) Check for proper connection to solenoid valve at “BLU/
BLK” circuit.
4) Check resistance of solenoid valve.
Timing solenoid valve resistance
Between terminal of transaxle side valve body
harness connector and transaxle: 11 – 15 at 20 °C
(68 °F)
Is check result satisfactory?
“BLU/BLK” circuit open. Replace timing solenoid
valve or lead wire.
Step Action Yes No
1
6
7
89
10
5
43
2
1
2
I3RM0B510018-01

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Suzuki SWIFT 2005 and is the answer not in the manual?

Suzuki SWIFT 2005 Specifications

General IconGeneral
BrandSuzuki
ModelSWIFT 2005
CategoryAutomobile
LanguageEnglish

Related product manuals