SVAN 948 USER MANUAL _
5 - 54
The view of the displays in the FILE sub-list with the LOAD SETUP text highlighted (displayed inversely)
Notice: It is not possible to load the file during the execution of the measurements. On
such attempt the message: „measurement in progress / MEASUREMENT IN PROGRESS” is displayed
for about 2 seconds.
After pressing the <ENTER> push-button the instrument checks its current state. In the case when
the measurements are performed the file loading is impossible. In such case the message with the
changing letters is displayed (see below) and the instrument returns after few seconds to the list from
which the LOAD position was called.
The view of the displays with the message stating the reason for unfeasibility of the required operation
In the case when the instrument memory is empty (no file is stored), after entering the LOAD
SETUP position the NO FILES text is displayed and the instrument waits for the reaction of the user. The
user should press then the <ESC>, <ENTER> or <START / STOP> push-button.
The view of the displays during the execution of the LOAD SETUP operation
The current number of the file and the total number of the saved files is displayed in the first line.
The name of the file is displayed inversely in the second line (its current number is presented in the first
line). The SETUP type of the current file is given in the third line. Date and time of the SAVE operation is
displayed in the fourth line. The change of the current file with the unit step can be done after pressing the
<
>, <
> push-buttons. After pressing the <
> with <SHIFT> push-button the first file is available and
after pressing the <
> with <SHIFT> push-button - the last one is displayed.
The view of the displays during the overview of the file list