5Methodsï€
Operation Manual 79
Programming run time events
1 Select Method.
2 Select Events.
3 Input the time at which you want the event to occur, select the event you want to program,
select the position of the hardware that is being controlled, and set the desired setpoint.
The run table
The programmed events are arranged in order of execution time in the Run Table.
Editing events in the run table
1 Select the event you wish to edit. If the desired event is not immediately visible, use the up
and down arrows to the right to scroll up and down the table until it is.
2 Select the parameter you want to change.
3 Input the new value
Deleting run time events
1 Select the event you wish to delete.
2 Select Delete.