EasyManuals Logo

ATEQ PRIMUS F Series User Manual

ATEQ PRIMUS F Series
214 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #61 background imageLoading...
Page #61 background image
Sheet #610u – End of cycle
Version 1.04a User guide ATEQ 6th series Page 5/7
1.4. "FILL" CYCLE END
If the part is OK, the Pass part relay is activated at the end of the test time and remains so till
the start of the next cycle.
At the end of the dump time, the end of cycle relay is activated (or at the end of coupling time B
if a value has been set for it).
If the part is fail, as soon as the test time is finished the Fail part relay becomes and remains
activated.
The instrument waits for a reset from the operator or the PLC to start the dump time and send
the end of cycle signal.
PRESSURE
START
Reset
A P-F P-D F S T D
t
t
t
t
t
t
t
program
number
automatic
Connector A
t
Fail part
B time
B time
End of cycle
Test cycle
Orders actions
t mini
t mini
t mini
Active
Inactive
Active
Inactive
#
automatic
Connector B

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ATEQ PRIMUS F Series and is the answer not in the manual?

ATEQ PRIMUS F Series Specifications

General IconGeneral
BrandATEQ
ModelPRIMUS F Series
CategoryTest Equipment
LanguageEnglish

Related product manuals