9.2.6 BA ROLLANT 240 - 250 - 254 - 255 - 000 299 119 5
Operation
Starting operation of the round baler
Attention!
The control box must be switched off before
starting the tractor engine.
Turn knob (N) of the emergency stop switch in
direction of arrow (clockwise) to switch the control box
on.
When the baler is ready for operation, the control light
(K) lights up after approximately 3 seconds.
Drive the round baler up to the swath and activate the
power take-off shaft.
Broad and thick swaths ensure uniform filling of the
baling chamber and thus perfectly shaped round
bales.
When working with thin swaths it is recommended to
“oscillate” when driving. (Convey swaths always
approx. 15 m (590.6 inch) at the right and left into the
baling chamber.)
(Fig. 9)
9