EasyManua.ls Logo

GE MDS ORBIT ECR - Page 327

GE MDS ORBIT ECR
463 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MDS 05-6632A01, Rev. F MDS Orbit MCR/ECR Technical Manual 327
6. Configure secondary route towards SCADA back-office network (10.10.1.0/24) with GRE1 as
the outgoing interface and preference value of 20.
- From the same page, click ‘Add’ to add the secondary route over GRE1 tunnel interface:

Table of Contents

Related product manuals