I
-
I
-
Configuring Your Wst System
Measurement
System
Topology
When configuring your test system, there are many things to consider,
such as:
l
How many test stations do you need?
l
How many test stations will be needed in the future?
l
How much space is available at each test station?
l
What type of testing will be done?
l
How will the measurement be controlled?
l
How will the data be analyzed and archived?
l
What level of throughput is required?
After answering these questions, you should decide which of the following
configurations best meets your needs.