I
-
I
-
Contents
1. Installing the Analyzer
Step 1. Check the Shipment
.............
Step 2. Meet Electrical and Environmental Requirements .
Step 3. Check the Analyzer Operation
.........
Step 4. Configure the Analyzer
............
Connecting Peripherals and Controllers
.......
Installing the Analyzer In a Rack
..........
Preventive Maintenance ...............
2. Getting Started
Front Panel Tour
..................
Entering Measurement Parameters
...........
Performing the Operator’s Check
...........
Equipment List ..................
Make a Transmission Measurement
.........
Make a Reflection Measurement
...........
If the Analyzer Fails the Operator’s Check
......
3. Making Measurements
Measuring Devices with Your Network Analyzer
.....
When to Use Attenuation and Amplification in a
Measurement Setup ...............
When to Change the System Impedance
.......
The Typical Measurement Sequence
.........
Using the BEGIN Key to Make Measurements
.....
lJiZi!i]
Key Overview
................
Using the
[m)
Key To Configure Measurements
....
The User BEGIN Function (Option
lC2
only)
....
Measuring Transmission Response
...........
Enter the Measurement Parameters
.........
Calibrate For a Transmission Response Measurement
.
Connect the DUT .................
View and Interpret the Transmission Measurement
Results ....................
Measuring Reflection Response
............
Enter the Measurement Parameters
.........
l-3
l-4
l-9
l-10
l-11
1-17
1-18
2-3
2-4
2-13
2-14
2-15
2-17
2-19
3-3
3-9
3-10
3-11
3-12
3-13
3-15
3-17
3-18
3-18
3-19
3-21
3-22
3-24
3-24
Contents-l
I-