Manitowoc Published 08-12-19, Control # 224-13 3-47
MLC650 OPERATOR MANUAL OPERATING CONTROLS AND PROCEDURES
VPC-MAX Beam Rear Pins, Upper
• Select and confirm item 25.
• Move the control handle I in either direction to energize the function.
• Move the control handle II FORWARD to ENGAGE the upper pins or move
the control handle II REARWARD to DISENGAGE the upper pins.
VPC-MAX Beam Rear Pins, Lower
• Select and confirm item 26.
• Move the control handle I in either direction to energize the function.
• Move the control handle II FORWARD to ENGAGE the lower pins or move
the control handle II REARWARD to DISENGAGE the lower pins.
Table 3-15. Identification and Operation of Remote Controls