4-1
4 Operations and Ventilation Setup
WARNING
z Before using this anesthesia machine on the patient, make sure that the system is
correctly connected and in good condition, and that all the tests described in 6
Preoperative Test are already completed. In case of test failure, do not use the
system. Have a qualified service representative repair the system.
4.1 Turn on the System
1. Connect the power cord to the AC power source. Make sure that the AC power LED is
illuminated.
2. Set the system switch to ON. Make sure that both the operating state LED and battery
LED are illuminated (the battery is being charged or fully charged).
3. The alarm lamp flashes yellow and red once in turn and then a beep is given.
4. The display shows the start-up screen and then enters the standby screen after half a
minute.
WARNING
z Do not use the anesthesia machine if it generates alarms during start-up or fails to
operate normally. Contact your service personnel or us.
4.2 Turn off the System
To turn off the system, do as follows:
1. Confirm that system use is finished.
2. Set the system switch to OFF.
NOTE
z For the first mechanical ventilation of each patient, do not exit the standby screen
if mechanical ventilation related parameters are not set properly. Adjust fresh gas
and anesthetic agent concentrations (if necessary) on the standby screen and set
ventilation parameters properly based on the patient’s conditions before applying
mechanical ventilation.