EasyManuals Logo

Mindray WATO EX-65 Operator's Manual

Mindray WATO EX-65
276 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #83 background imageLoading...
Page #83 background image
6-1
6 Preoperative Test
6.1 Preoperative Test Schedules
6.1.1 Test Intervals
Perform the preoperative tests listed below at these events:
1. Before each patient.
2. When required after a maintenance or service procedure.
The following table indicates when a test must be done.
Test Item Test Intervals
Pipeline tests
Cylinder tests
Flow control system tests
Every day before the first patient
Inspect the system
Alarm tests
Power failure alarm test
Breathing system tests
O2 Flush Test
Preoperative preparations
Inspect the AGSS
Before each patient
NOTE
z Read and understand the operation and maintenance of each component before
using the anesthesia machine.
z Do not use the anesthesia machine if a test failure occurs. Contact us immediately.
z A checklist of the anesthetic system should be provided including aneshetic gas
delivery system, monitoring device, alarm system and protective device which are
intended to be used for the anesthetic system, whether they are used alone or
assembled together.

Table of Contents

Other manuals for Mindray WATO EX-65

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mindray WATO EX-65 and is the answer not in the manual?

Mindray WATO EX-65 Specifications

General IconGeneral
TypeAnesthesia Machine
ModelWATO EX-65
BrandMindray
Tidal Volume Range20 to 1500 mL
O2 Concentration21% to 100%
I:E Ratio4:1 to 1:8
Ventilation ModesVCV, PCV, SIMV, Manual, Spontaneous
Flow MeterO2, N2O
VaporizerUp to 2 vaporizers
PEEP0 to 20 cmH2O
Gas SupplyO2, N2O, Air
MonitoringAirway Pressure, Flow, Volume
O2 Flush35 to 75 L/min
Respiratory Rate4 to 100 breaths per minute
Power Supply100 to 240 VAC, 50/60 Hz
Fresh Gas Flow0 to 15 L/min

Related product manuals