OMICRON 49
Home view
After you have connected to the test system, the following dialog box appears.
Figure 6-13: Test set information dialog box after connecting to CIBANO 500
Note: For connecting to a test system not included in the list, see 20.1 "Connecting to CIBANO 500" on
page 295.
After you have connected to a test system, right-click the CIBANO 500 symbol in the status bar, and then
do one of the following:
► To disconnect from a test system, click Disconnect.
► To display information about the connected test system, click Show test set information.
► To update the test set information, click Refresh test set information.
Note: You can open the Test set information dialog box also by double-clicking the CIBANO 500
symbol.