Specifications
Site requirements
Management
2. Confirm that your site meets the required electrical and environmental
requirements. See Site Planning Checklists.
3. Familiarize yourself with safety precautions and electrostatic discharge (ESD).
4. Before installing the server, read the safety information in Oracle Server Safety
and Compliance Guide and in Important Safety Information for Oracle's Hardware
Systems.
5. Assemble the required tools and equipment for installation.
6. Confirm that you received all the items you ordered. See Shipping Inventory.
7. Install any separately shipped optional components.
Safety Precautions
This section describes safety precautions you must follow when installing the server
into a rack.
Appendix C
Installation Prerequisites
C-4