4. Repeat Step 3 until all replacement DIMMs are installed.
5. Return the server to operation:
a. Install the air baffle.
See Install the Air Baffle.
b. Install the server top cover.
See Install the Server Top Cover.
c. Return the server to the normal rack position.
See Return the Server to the Normal Rack Position.
d. Reconnect the power cords and data cables to the server.
See Reconnect Power and Data Cables.
e. Power on the server.
See Power On the Server.
f. Verify that the power supply AC OK LED is lit.
6. (Optional) Use Oracle ILOM to clear server DIMM faults.
DIMM faults are automatically cleared after a new DIMM has been installed. If you need
to manually clear DIMM faults, refer to Oracle ILOM Documentation.
Note:
If you want to move a failed DIMM to a new DIMM slot or re-seat a DIMM for
troubleshooting, you must first manually clear the associated DIMM fault.
Otherwise, the DIMM fault might follow the DIMM to the new slot location or
reoccur in the current slot location, causing a false DIMM fault condition.
Chapter 9
Install a DIMM
9-9