Table of Contents
Revision W HF Series X-ray Generators - Service Manual
iv Quantum Medical Imaging
CHAPTER 2 - ASSEMBLY & INSTALLATION (CONT’D)
GENERATOR CABINET SETUP ......................................................... 2-6
Transformer Line Tap Adjustment (Single Phase Non-SE Systems) 2-8
Transformer Line Tap Adjustment (Single Phase SE Systems) ....2-10
AC Input (Mains) Connection ...................................................2-12
High Voltage (H.V.) Tank ........................................................2-15
High Voltage Cables ................................................................2-18
INTERFACE BOARD SETTINGS & CONNECTIONS ............................2-21
Door Interlock Switch Connection ............................................2-22
"In Use" Light Switch Connection .............................................2-22
Collimator Connections ............................................................2-23
Tube Stand/Peripheral Equipment Connections .........................2-23
Internal +28 VDC Power Supply Option (QG-28VPS) .................2-23
Tube Rotor Boost Voltage Verification (Systems without
High (Dual) Speed Starter Option) ..........................................2-24
RADIOGRAPHIC SYSTEM EQUIPMENT CONNECTIONS ....................2-25
Tube Rotor Cable (Systems without High (Dual) Speed
Starter Option) ......................................................................2-25
Tube Rotor Cable (Systems with AID External High
Speed Starter QG-HSS Option Only) ........................................2-27
Tube Rotor Cable (Systems with Internal High Speed
Starter Q-HSS Option Only) ....................................................2-30
Table/Wall Bucky Connections .................................................2-34
Table/Wall Ion Chamber Connections (AEC Option Only) ...........2-34
Interfacing to Canon Digital Radiographic Receptor
(When Applicable) .................................................................2-35
Interfacing to CMT Digital Radiographic Receptor
(When Applicable) .................................................................2-36
Interfacing to Siemens Ion Chambers (When Applicable) ...........2-36
Interfacing to Pausch Tomography System (When Applicable) ...2-39
OPERATOR CONTROL PANEL SETUP ..............................................2-41
ODYSSEY Operator Control Panel ............................................2-41
OCP Pedestal Mounting (QG-PDL Option) .................................2-41
OCP Wall Mounting (QG-WM Option) .......................................2-43
Q-VISION Operator Control Panel ............................................2-44
Integrated Workstation Operator Control Panel .........................2-46
Optional Remote Expose Switch Connection .............................2-47
INITIAL POWER UP ......................................................................2-47
TRANSFORMER TAP VALIDATION ..................................................2-48
Q-VISION OPERATOR CONTROL PANEL - NETWORK
SETTINGS VERIFICATION ............................................................2-49
ROTOR DRIVE BOARD A10 (AY40-013T) PERFORMANCE
VERIFICATION ............................................................................2-55
CHAPTER 3 - CALIBRATION
OVERVIEW .......................................................................................... 3-3
REQUIRED TOOLS AND MATERIALS ............................................... 3-3