4-92 ECODRIVE03 DKC**.040, DKC**.100, DKC**.200 ECODRIVE03 Drive Controllers
See page 4-47: "Drive halt (AH) and Drive enable (RF)".
With central mains supply (see page 4-25: "Arranging the Central supply")
the DKC ’s operated on one DC bus must be informed about the status of
the power supply.
The output U
Dmessage
(X3.11) is high, upon completion DC bus load.
With this type of mains supply, the U
D
-message X3.11 serves as a signal
source to the DKC ’s connected to the mains supply.
U
D power supply
L1
L2
L3
mains
voltage
detected
> 1
=
Ap5281f1.fh7
U
D
Fig. 4-148: Correlation of U
D power supply
and U
D
(U
D message
)
See page 4-55: "Digital outputs (ready, warning and UD)".
Connection U
D
power supply:
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
10
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
10
1
2
3
4
5
6
7
8
9
11
12
13
14
15
16
17
18
10
AP5141F1.FH7
to the
control
X3 on the
drive controller
DKC**.3 with
line voltage
supply
X11 on the
drive controller
DKC**.3
X11 on the
drive controller
DKC**.3
reviecerreviecerrotceted yramirp
Fig. 4-149: U
D
power supply
Inputs
U
D
power supply:
U
D
power supply:
customerservice@hyperdynesystems.com | (479) 422-0390