EasyManua.ls Logo

Segway VILLIAN SSV Series - Install the Gear Assembly; Install the Main Shaft Assembly; Install the Right Box Body Combination

Segway VILLIAN SSV Series
407 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 -
25
FRONT AXLE AND REAR GEARBOX
FRONT AXLE AND REAR GEARBOX
A
A
B
B
A
A
B
B
Install the main shaft assembly
A
Bushing
B
Main shaft
Tools: copper hammer.
Press
A
into
B
according to the icon.
Install the gear assembly
A
Reverse gear idler shaft assembly
B
Main shaft assembly
C
Rear axle output gear assembly
First put
A
into the left box body according to
the gure, then put
B
into the left box body, and
nally put
C
into the left box body.
!
!
CAUTION
When installing the
C
rear axle output gear, pay attention
to the gap between the gear and the box body to prevent
ngers from being pinched.
Install the right box body combination
A
Right gearbox
B
Bolt M8×40
C
Bolt M8×60
Tool: 10mm sleeve.
Apply sealant according to the gluing track as shown
in the gure. The glue application should be uniform
and continuous, and the glue line width should be
about 1.5-2mm.
Align with the positioning pin hole of the left
box body, install
A
, and tighten the bolts in
sequence.
Bolt M8×40
12N·m
(1.22kgf·m,8.86ft·lb)
(1.22kgf·m,8.86ft·lb)
Bolt M8×60
12N·m
(1.22kgf·m,8.86ft·lb)
(1.22kgf·m,8.86ft·lb)
A
A
B
B
C
C
胶线轨迹
A
A
B
B
C
C

Table of Contents

Related product manuals