7
05.01
7.1 Line supply fuses, commutating reactors, transformers and main switches
7-211
Siemens AG 2001 All rights reserved
SIMODRIVE 611 Planning Guide (PJU) – 05.01 Edition
7.1.7 Assigning main switches
Note
Before powering–down, terminal 48 of the NE module must be de–energized
10 ms before the contacts of the switch open.
Main switches with leading auxiliary contacts can be used to ensure that
terminal 48 of the NE module is first de–energized.
Recommendation:
Siemens switches, types 3LC.../3KA5... (from the Catalog SIEMENS
”Low–voltage switchgear”)
Table 7-7 Assigning the main and auxiliary switches
For UI modules
5 kW 10 kW 28 kW
Switch-
type
3LD2103–0TK...
+
3LD9220–3B
3LD2504–0TK...
+
3LD9250–3B
3LD2704–0TK...
+
3LD9280–3B
For I/R modules
16 kW 36 kW 55 kW 80 kW 120 kW
Switch
type
3LD2504–0TK...
+
3LD9250–3B
3LD2704–0TK...
+
3LD9280–3B
3LD5330–1EE00
+
3LD1400–0A
3LD5330–1EE00
+
3LD1400–0A
3LD5730–1EE00
+
3LD1400–0A
7 Line Supply Connection