Electrical connection
5.4 Terminals and connectors
SINAMICS DCP
Operating Instructions, 09/2019, A5E34382853K
51
Position of the PE connections for the 120 kW device
To access the PE connections for the 120 kW device, the corresponding covers at the top
and bottom must be removed.
Upper ground connection with attached cover
Upper ground connection with cover removed
Lower ground connection with attached cover
Lower ground connection with cover removed
Nut tightening torque: 13 Nm.