EasyManua.ls Logo

Siemens sinamics dcp - Page 53

Siemens sinamics dcp
450 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Electrical connection
5.4 Terminals and connectors
SINAMICS DCP
Operating Instructions, 09/2019, A5E34382853K
51
Position of the PE connections for the 120 kW device
To access the PE connections for the 120 kW device, the corresponding covers at the top
and bottom must be removed.
Upper ground connection with attached cover
Upper ground connection with cover removed
Lower ground connection with attached cover
Lower ground connection with cover removed
Nut tightening torque: 13 Nm.

Table of Contents

Other manuals for Siemens sinamics dcp

Related product manuals