EasyManua.ls Logo

Technogym Group Cycle D92 - Replacing the Right and Left Pedal Crank

Technogym Group Cycle D92
232 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11.4.3 REPLACING THE
RIGHT AND LEFT
PEDAL CRANK
1
1
Figure 148
Remove the pedal crank as indicated in “11.4.1
Removing the right pedal crank” or “11.4.2 Re-
moving the left pedal crank”.
1. Use the previously-removed screw (1)
and tighten with a torque wrench set be-
tween 47Nm (34.7 lbf-ft) and 54Nm (39.8
lbf-ft).
2. Remove the screw (1).
3. Tighten the (new) screw (1) with a torque
wrench set between 47Nm (34.7 lbf-ft)
and 54Nm (39.8 lbf-ft).
New Group Cycle (D92):
Technical Service Guide - Rev. 5.1
Document uncontrolled when printed
Page 156

Table of Contents

Related product manuals