5. MOVING AND INSTALLING THE EQUIPMENT
5.1 INSTALLATION SPECIFICATIONS AND
REQUIREMENTS
WARNING: Refer to the relative specic manual: INSTALLATION REQUIREMENTS,
which can be consulted on TG DIRECT.
1. Place the equipment on a at surface, where there are no vibrations and where the loading
bearing capacity is sucient for the weight to be supported, also taking into consideration
the weight of the user.
2. The equipment is shipped partially dismantled, packed in cardboard packaging.
Follow the assembly operations indicated on the instruction sheets provided with the equipment or
during the distribution logistics course, available on E-Learning.
3. The area is not dusty or sandy.
4. You have observed the temperature and humidity operating requirements indicated in:
“2.2 Environmental characteristics”.