Installation 47
Mechanical Installation, cont’d
Locate the eight (8) pin motor cable connector attached to the Main Enclosure and
connect it to the mating bulkhead connector on the bottom of the Servo Tyer. Locate the
thirty-two (32) pin main control cable connector attached to the Main Enclosure and
connect it to the mating bulkhead connector on the bottom of the Servo Tyer. Locate the
thirty-two (32) pin operator control box connector attached to the Main Enclosure and
connect it to the mating bulkhead connector on the side of the control panel. Locate the
4 pin brush motor cable attached to the Main Enclosure and connect it to the to the brush
bulkhead connector. These connectors are keyed so that they cannot be plugged into the
wrong receptacles.
4 Pin Brush
Motor Cable
8 Pin Motor
Cable
32 Pin Main
Control Cable
32 Pin
Operator
Control Cable