13.1.6 Resolve a failed Smart Meter Verification test
Use this procedure if a Smart Meter Verification Basic or Professional test ran at normal operating conditions
while conditions were stable and failed.
Procedure
1. Verify the sensor by performing a visual inspection, density verification, or field proving.
2. If possible, run Smart Meter Verification Professional with ProLink III Basic or Professional and save the
results as follows:
• In a .csv file
• In a report
• If the transmitter has a historian, retrieve the Smart Meter Verification results from the service or
historian files.
3. Contact the factory for further evaluation and instructions.
13.1.7 Set up Smart Meter Verification automatic execution
You can execute a Smart Meter Verification Basic or Professional test on demand or automatically schedule
future runs. You can schedule future runs via two different options: as a single test at a user-defined future
time, or automatically on a regular schedule.
Tip
The time between test runs must be between 1 and 1000 hours. The time for the first test run can be any
positive floating number.
Set up Smart Meter Verification automatic execution using the display
Procedure
1. Choose Menu → Operations → Smart Meter Verification → Schedule Verification.
2. To schedule a single test:
a) Set Hours to 1st Run to the number of hours to elapse before the test is run.
b) Set Hours Between to 0.
3. To schedule a recurring execution:
a) Set Hours Between to the number of hours between recurring runs.
4. To disable scheduled execution:
a) Set Hours to 1st Run to 0.
b) Set Hours Between to 0.
Configuration and Use Manual Measurement support
MS-00809-0200-1600 May2024
Configuration and Use Manual 143