EasyManua.ls Logo

Emerson Micro Motion 1600 - Set up Smart Meter Verification automatic execution using ProLink III Basic or Professional; Set up Smart Meter Verification automatic execution using a field communicator; Set up Smart Meter Verification automatic execution from a Modbus host

Emerson Micro Motion 1600
234 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Set up Smart Meter Verification automatic execution using ProLink III Basic
or Professional
Procedure
1. Select one of the following paths to access the Smart Meter Verification scheduler:
ProLink III Basic or Professional: Choose Device ToolsDiagnosticsMeter Verification
Schedule Meter Verification.
ProLink III Professional: Choose Smart Meter Verification OverviewToolsSchedule Smart
Meter Verification.
2. To schedule a single test:
a) Set Specify Time Until Next Run to the number of days, hours, and minutes to elapse before the
test is run.
b) Set Specify Time Between Recurring Runs to 0 days, 0 hours, and 0 minutes.
3. To schedule a recurring execution:
a) Set Specify Time Until Next Run to the number of days, hours, and minutes to elapse before the
first test is run.
b) Set Specify Time Between Recurring Runs to the number of days, hours, and minutes to elapse
between runs.
4. To disable scheduled execution, choose Disable Scheduled Execution.
Set up Smart Meter Verification automatic execution using a field
communicator
Field communicator
Device SettingsCalibrationSmart Meter VerificationManual VerificationStart
Procedure
1. To schedule a single test:
a) Set Hrs Until Next Run to the number of hours to elapse before the test is run.
b) Set Recurring Hours to 0.
2. To schedule a recurring execution:
a) Set Hrs Until Next Run to the number of hours to elapse before the first test is run.
b) Set Recurring Hours to the number of hours to elapse between runs.
3. To disable scheduled execution, select Turn Off Schedule.
Set up Smart Meter Verification automatic execution from a Modbus host
Use the Modbus host to set up the schedule.
Prerequisites
To configure a test execution and view a scheduled test execution, the Modbus host must be connected to the
transmitter. Once the schedule is loaded into the transmitter, the Modbus host no longer has to be connected
to the transmitter.
Procedure
1. Choose any of the following options:
Measurement support Configuration and Use Manual
May2024 MS-00809-0200-1600
144 Emerson.com

Table of Contents

Other manuals for Emerson Micro Motion 1600

Related product manuals