4. Select the desired output behavior.
Option Description
Continue Measuring During the test, all outputs will continue to report their assigned process
variables. The test will run for approximately 90 seconds.
Fix at Last
Measured Value
During the test, all outputs will report the last measured value of their assigned
process variable. The test will run for approximately 140 seconds.
Fix at Fault During the test, all outputs will go to their configured fault action. The test will
run for approximately 140 seconds.
5. Select Start and wait for the test to complete.
Note
At any time during the process, you can abort the test. If the outputs were fixed, they will return to
normal behavior.
Run a Smart Meter Verification test using a field communicator
Field communicator
Device SettingsCalibrationSmart Meter VerificationManual VerificationStart
Procedure
1. Read the Smart Meter Verification prerequisites in Use Smart Meter Verification if you have not done so
already.
2. Select the desired output behavior.
Option
Description
Continue Measuring During the test, all outputs will continue to report their assigned process
variables. The test will run for approximately 90 seconds.
Fix at Last
Measured Value
During the test, all outputs will report the last measured value of their assigned
process variable. The test will run for approximately 140 seconds.
Fix at Fault During the test, all outputs will go to their configured fault action. The test will
run for approximately 140 seconds.
The test starts immediately.
3. Wait for the test to complete.
Note
At any time during the process, you can abort the test. If the outputs were fixed, they will return to
normal behavior.
Run a Smart Meter Verification test from a Modbus host
Prerequisites
The Modbus host must be connected to the transmitter.
Procedure
1. Read the Smart Meter Verification prerequisites in Use Smart Meter Verification if you have not done so
already.
2. If you are fixing outputs during the test, set the output state from Register 3093.
Configuration and Use Manual Measurement support
MS-00809-0200-1600 May2024
Configuration and Use Manual 139

Table of Contents

Other manuals for Emerson Micro Motion 1600

Related product manuals