For configurations above 55 kg:
At least four people are needed to lift the server out of
the rack cabinet.
Additionally, a lifter is required in the following cases:
–
The server weighs more than 50 kg.
–
The server weighs more than 21 kg and is to be removed above the height
of 25 U.
When using a lifter
, this removal procedure needs to be carried out by
maintenance personnel.
Figure 4: Removing the server from the rack
Basic hardware procedures
50 Upgrade and Maintenance Manual RX4770 M5