▶
Remove the ejected memory module.
▶
If applicable, install a dummy module.
Concluding steps
For memory slots from A to M valid for the bottom system board.
▶
Install the air duct on the bottom system board, see "Installing the CPU air
duct" on page
74.
▶
"Installing the top system board holder" on page 79.
▶
"Installing the riser module 3/4 and 6/7" on page 62.
▶
"Installing the fan cage" on page 71.
▶
Install the air duct on the top system board, see "Installing the CPU air duct"
on page 74.
▶
"Reassembling" on page 53.
▶
"Installing the server in the rack" on page 55.
▶
"Connecting the power cord (AC PSU)" on page 58.
▶
"Switching on the server" on page 59.
▶
"Resuming BitLocker functionality" on page 108.
For memory slots from N to Z valid for the top system board.
▶
Install the air duct on the top system board, see "Installing the CPU air duct"
on page 74.
▶
"Reassembling" on page 53.
▶
"Connecting the power cord (AC PSU)" on page 58.
▶
"Switching on the server" on page 59.
▶
"Resuming BitLocker functionality" on page 108.
10.6 Replacing memory modules
For memory slots from A to M valid for the bottom system board.
Main memory
264 Upgrade and Maintenance Manual RX4770 M5